Skip to content

Garden suites and laneway suites in Toronto

A second building at the back of the lot is often the simplest way to add a home. These guides cover which lots qualify and what a suite costs to build.

Start here

More on this

Common questions

Does every Toronto lot qualify for a garden suite?

No. There's no minimum lot size, but a lot is disqualified if it can't meet Ontario Building Code fire and emergency access standards, which a Minor Variance cannot waive, if the design would require removing a healthy by-law-protected tree, or if the lot falls under TRCA-regulated ravine or natural feature rules that require a separate conservation authority permit.

From: Toronto Garden Suite Rules Explained for Owners and Builders

Does every rear laneway in Toronto qualify a lot for a laneway suite?

No. The lane has to be a public lane, not a private one, and the lot's rear or side lot line has to abut it for at least 3.5 metres under Zoning By-law 569-2013 s.150.8.30.20(1).

From: Which Toronto Lots Actually Qualify for a Laneway Suite

How big can a garden suite be in Toronto?

Up to 60 square metres for a one-storey garden suite, or 120 square metres for a two-storey garden suite, under Zoning By-law 569-2013 Chapter 150.7 as amended by By-law 849-2025. Toronto City Council passed this by-law on July 24, 2025.

From: What a Garden Suite Actually Costs to Build in Toronto

What's the difference between a garden suite and a laneway suite in Toronto?

A laneway suite requires the lot to abut a public laneway for at least 3.5 metres. A garden suite is the parallel permission for lots without that lane access. Garden suites are covered by Chapter 150.7 of Zoning By-law 569-2013. Laneway suites are covered by a separate chapter, 150.8, with different setback and landscaping tests.

From: Toronto Garden Suite Rules Explained for Owners and Builders

What's the difference between a laneway suite and a garden suite in Toronto?

Both are secondary units in an ancillary building, but a laneway suite requires the lot to abut a public lane while a garden suite doesn't. A lot can have one or the other under the zoning by-law, never both.

From: Which Toronto Lots Actually Qualify for a Laneway Suite

Are garden suites exempt from Toronto development charges?

Not automatically. The City's garden suite program only defers development charges for 20 years (By-laws 810-2018 and 1210-2019); it doesn't waive them. Within those 20 years, the deferred charge becomes payable if a new lot is created through a severance, subdivision or condominium plan. It can also become payable if you sell the property, unless you and the buyer sign an Assumption Agreement so the new owner takes over the deferral. A separate rule reduces the development charge to zero for the second through sixth unit on a parcel, with no set end date. That rule may or may not apply to a given garden suite.

From: What a Garden Suite Actually Costs to Build in Toronto

Check a Toronto address

The Toronto Lot Check shows a lot's zone, its overlays and whether it qualifies for a sixplex, in about 3 seconds. It is free. For a property outside Toronto, contact TESA directly.

Other topics